Portfolio: Project Details
World Savings & Loan Association Operations Center
Investigation and Repair Design
San Leandro, CA
|
On the first floor of this building, slab-on-grade moisture problems under
carpet tiles were causing condensation and damaging flat electrical cable
systems. After extensive testing, Interactive Resources diagnosed the problems
and prepared specifications for repairs. We designed and scheduled the
repair work to be performed in such as way as to keep the facility fully
operational throughout the repair procedure.