The Student Services Center at Contra Costa College provides a wide range of support services to the college’s diverse enrollment of approximately 8,000 students. The Center was envisioned to serve as a “one-stop” counseling, financial aid and career guidance resource...
Stewart Elementary School Modernization & Expansion
Elizabeth Stewart Elementary School in Pinole was constructed in the 1960s and was in significant need of modernization and expansion as it entered the 21st century. Based on our track record of successfully completed school projects in the Bay Area, Interactive...
Vallejo Fire Station # 27 Structural Design
Interactive Resources, Inc. provided structural engineering design services for this new three-bay, 9,300 sf fire station in Vallejo. The steel-framed structure’s sloped roof ascends by approximately thirteen feet in height from one end to other. The fire trucks and...
Jolly Giant Dining Commons Seismic Retrofit, Interior & ADA Upgrades, CSU Humboldt
The Jolly Giant Commons multi-purpose facility serves the resident student community of California State University’s (CSU) Humboldt campus. The CSU system retained Interactive Resources, Inc. to perform a seismic evaluation of the Commons and the bridges that link it...
Point Sur Light Station Historical Restoration & Rehabilitation
Point Sur Light Station is the most complete surviving nineteenth century light station complex on the Pacific Coast, and possibly in the United States. The complex contains seven buildings, constructed at varying times over the course of thirty years, beginning in...
Benicia Clock Tower Seismic Retrofit
The Benicia Clock Tower is two-story, 20,000 sf unreinforced stone masonry structure originally constructed as a U.S. Army arsenal in 1857. It presently serves as a community assembly hall. The City of Benicia retained Interactive Resources, Inc. to provide a...