Beginning in 2007, Interactive Resources, Inc. was retained as part of a team composed of Jacobs Engineering, BART staff and consultants to quantify, categorize, strategize and conduct field investigations for water penetration of both building envelopes and...
BART – Powell Street Waterproofing
In 2016, BART successfully completed an extensive remedial waterproofing project at the concrete ceiling of the Mezzanine Level of the Powell Street BART Station. Tom Butt of Interactive Resources, Inc. was the project architect contracted as a subconsultant to the...
Davis Hall Rooftop Louver Waterproofing
Interactive Resources, Inc. was selected by the University of California, Berkeley, to address chronic water leakage associated with fan room louvers on the 7th floor of Davis Hall, home to the University’s Department of Civil and Environmental Engineering. Our...
University Hall Envelope Improvements
University Hall, designed by Welton Becket and Associates and constructed in 1959, is a large concrete-frame high-rise building that houses administrative offices for the University of California, Berkeley. The structure is composed of a seven-story tower and an...
Franchise Tax Board Forensic Investigation
As part of an IDIQ contract for forensic architecture and engineering services for the State of California, DGS, Interactive Resources, Inc. conducted a forensic investigation of ongoing water intrusion at two locations on the Franchise Tax Board campus. The water...
Fitch Mountain Elementary School Water Intrusion Investigation & Repairs
The Fitch Mountain Elementary School was suffering from water damage. The Healdsburg Unified School District retained Interactive Resources, Inc. to provide forensic architectural and engineering services for the repair design of the extensive water damage at the...