Interactive Resources was retained by Sunterra Solar to provide structural engineering services or a new solar canopy to be located atop the new parking garage facilities at the City of Lake Forest Civic Center in Lake Forest, California. Structural engineering...
Foothill Transit District – Covina Transit Center Park & Ride Solar Carport
Interactive Resources was retained by Sunterra Solar to provide structural engineering services for a new solar canopy to be located atop the new parking garage facilities at the Covina Transit Center Park and Ride located in Covina, California. Structural engineering...
SpaceX Solar Array
Interactive Resources was retained by SolarCity (merged with TESLA) to provide structural engineering services and review the roof framing at the existing SpaceX facilities located in Hawthorne, California. Structural engineering services were provided to evaluate the...
Windsor High School Solar Array
Interactive Resources was retained by SolarCraft the new roof- mounted solar arrays located at the Windsor High School’s Digital Communications Facility, located at 8695 Windsor Rd. in Windsor, CA. Design services included: reviewing the available “as-built” drawings...
Sierra College Solar Array
Interactive Resources was retained by Borrego Solar to provide structural engineering Services for the roof-mounted solar array(s) at the existing Rocklin campus’s student center and campus bookstore buildings. Design services included reviewing the available...
PG&E Stroud & Westside Solar Array
Interactive Resources was retained by Cupertino Electric to provide structural engineering design services for the 20 Megawatt ground-mounted solar array at the PG&E Stroud site (located in Helm, CA) and the 15 Megawatt ground-mounted solar array Westside site...